Parallel Operation of Single Phase Transformer



Magnetic Amplifier Study Unit

 

salient features

1.Parallel operation of transformers is done when there is an increase in load demand. If we connect only one transformer, it will become insufficient for the heavy load.

2.To maintain the economics and load sharing very effective, the parallel connection of transformers is carried out.

3.Voltage ratings of both the primary and secondary should be identical for both the transformers.

 